The project

Villa Joyeuse is a historic villa listed as part of Saint-Raphaël's heritage. This complete renovation project was subject to the opinion of the Architects of the Buildings of France (ABF), requiring strict adherence to heritage criteria while modernizing all technical installations.

Launched in January 2023, this project presented significant organizational challenges. Immotech stepped in to restructure project management, ensure a permanent presence on the construction site, and coordinate all stakeholders: companies, architect, and project owner.

Thanks to a local policy and rigorous coordination; Immotech was the central point between all stakeholders to bring this demanding heritage project to completion.

The stakes of the project

Respect for historical heritage

Renovation of a listed villa subject to the opinion of the ABF, requiring respect for the materials, traditional techniques and original architecture while integrating modern comfort.

Restructuring of an ongoing project

Resumption of an already launched project requiring organizational upgrades, clarification of roles and enhanced coordination between all stakeholders.

Complex multi-phase coordination

Management of three distinct and partially overlapping phases: demolition/stripping, renovation of the villa, then redevelopment of the park with the creation of a swimming pool.

Our triple mission: AMO / MOE / OPC

Immotech intervened with a complete mission covering project management assistance, project management and scheduling-control-coordination.

Project Management Assistance (AMO)

Project Management (MOE)

Scheduling, Management, Coordination (SMC)

A three-phase project

Phase 1

Demolition and stripping

January 2023 – January 2024

Objective : Preparing the villa for its complete renovation

Work completed:

  • Complete gutting of existing interior fittings
  • Demolition of non-load-bearing partitions
  • Removal of old coverings (floors, walls, ceilings)
  • Waste disposal and recycling
  • Protection of architectural elements to be preserved
  • In-depth diagnosis of existing structures

Challenges: This phase revealed heritage elements requiring special attention and validation by the ABF before work could continue.

Villa renovation

February 2024 – March 2025

Objective : Completely renovate the villa while respecting its heritage character.

Work completed:

  • Complete roof renovation using traditional materials
  • Restoration of the facades and exterior joinery
  • Restructuring of interior spaces
  • Complete electrical renovation (bringing up to code)
  • Plumbing and heating renovation
  • Thermal and acoustic insulation
  • Installation of floor and wall coverings
  • Custom-made interior joinery
  • High-end paints and finishes

ABF constraints:

  • Use of traditional materials for the facades
  • Respect for the original colors and finishes
  • Preservation of characteristic architectural elements
  • Validation of technical and aesthetic choices at each stage

Phase 2

Phase 3

Park renovation and swimming pool construction

November 2024 – July 2025

Objective : Create an outdoor space in harmony with the villa

Work completed:

  • Landscaping redesign of the park
  • Creation of a swimming pool integrated into the garden
  • Installation of the filtration and treatment system
  • Terraces and outdoor walkways
  • Architectural outdoor lighting
  • Planting and revegetation
  • Outdoor furniture and amenities

Special feature: This phase partially overlaps with the renovation of the villa, requiring precise coordination to avoid disrupting the interior work.

Challenges encountered and solutions implemented

Reorganization of an ongoing project
Challenge : Project started without rigorous organization, lack of coordination between stakeholders.
Solution : Implementation of a detailed schedule, weekly site meetings, permanent presence of Immotech as a central coordination point.

Strict heritage constraints
Challenge : ABF validation required at each stage, processing times, adherence to traditional techniques.
Solution : Anticipating permit applications, compiling detailed technical files, and maintaining constant dialogue with the ABF (Architects of French Buildings) and the heritage architect.

Coordination of multiple trades
Challenge : More than 15 different companies on the construction site, risks of interference and delays.
Solution : A policy of proximity with daily presence, close coordination of interventions, and proactive conflict management.

Discoveries made during construction
Challenge : Non-compliant structural elements and installations discovered during demolition.
Solution : Responsiveness and adaptation of the schedule, technical solutions validated quickly with the project owner and the ABF.

The Immotech approach: proximity in the service of quality

Immotech deployed its resources on this demanding project. local policy which is its strength:

Permanent presence on the construction site

A dedicated project manager, present daily to coordinate companies, answer questions and make operational decisions.

Central coordination role

Immotech acted as the central point of contact between the project owner, the architect, the Architects of the Buildings of France, and all the companies involved. This position facilitated communication and accelerated decision-making.

Rigour and method

Detailed planning, precise budget monitoring, regular reporting, quality controls at each key stage.

Respect for heritage

Particular sensitivity to heritage issues, constructive dialogue with the ABF (Architects of French Buildings), respect for traditional techniques while integrating modern technologies.

A successful heritage project

Villa Joyeuse has been restored to its former glory while also benefiting from modern comforts. This heritage renovation project illustrates Immotech's ability to manage complex projects requiring:

  • Technical expertise across all trades
  • A sensitivity to heritage and architecture
  • Rigorous coordination of multiple stakeholders
  • A field presence and daily responsiveness
  • Compliance with strict regulatory constraints

The client now has a fully renovated villa, compliant with the requirements of the Architects of the Buildings of France, with a landscaped park and a swimming pool perfectly integrated.